Assessment Year | 2000 |
---|---|
Principal Product | Lawnmowers |
NAICS |
n/a
|
SIC | 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment |
Sales Range | $100 M to 500M |
# of Employees | 800 |
Plant Area |
180,000
ft2
|
Annual Production | 150,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $358,139 | 12,758,793 |
kWh
|
$0.028 |
Electricity Demand | $357,370 | 32,937 |
kW-mo/yr
|
$10.85 |
Electricity Fees | $50,085 | - |
|
- |
Natural Gas | $191,073 | 61,063 |
MMBtu
|
$3.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $359,777 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $59,142 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.454: Modify startup/shutdown times | $96,627 | - | - |
$91,157
-
kW-mo/yr
|
$5,470 | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,400 | $152,830 |
$16,020
667,644
kWh
|
$21,150
-
kW-mo/yr
|
$2,230 | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $7,416 | $63,200 |
$3,060
120,164
kWh
|
$3,950
-
kW-mo/yr
|
$406 | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,800 | - |
$5,254
218,933
kWh
|
$6,796
-
kW-mo/yr
|
$750 | - | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $26,280 | $64,000 |
$6,903
287,515
kWh
|
$17,890
-
kW-mo/yr
|
$1,487 | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,972 | $1,050 |
$2,902
120,750
kWh
|
$1,788
-
kW-mo/yr
|
$282 | - | - | - | |
07 | 2.8114: Change rate schedules or other changes in utility service | $97,512 | - | - | - | - | - | - | $97,512 | |
08 | 3.5311: Recover and reuse waste material | $14,770 | $1,250 | - | - | - |
$14,770
-
lb
|
- | - | |
09 | 4.513: Re-arrange equipment layout to reduce labor costs | $60,000 | $120,000 | - | - | - | - | $60,000 | - | |
TOTAL RECOMMENDED | $359,777 | $402,330 |
$34,139
1,415,006
kWh
|
$142,731
-
kW-mo/yr
|
$10,625 |
$14,770
-
lb
|
$60,000 | $97,512 | ||
TOTAL IMPLEMENTED | $59,142 | $155,130 |
$18,922
788,394
kWh
|
$22,938
-
kW-mo/yr
|
$2,512 |
$14,770
-
lb
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs