Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,060

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0217 #01 Y:1986 Keep lamps and reflectors clean $1,521 $4,450
OK0216 #06 Y:1986 Utilize higher efficiency lamps and/or ballasts $2,905 -
OK0216 #05 Y:1986 Utilize higher efficiency lamps and/or ballasts $3,363 $5,742
OK0216 #04 Y:1986 Utilize energy-efficient belts and other improved mechanisms $97 $60
OK0216 #03 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $753 -
OK0216 #02 Y:1986 Install timers and/or thermostats $4,180 $2,250
OK0216 #01 Y:1986 Replace fossil fuel equipment with electrical equipment $8,049 $1,300
MA0084 #06 Y:1986 Turn off equipment during breaks, reduce operating time $578 $200
MA0084 #05 Y:1986 Utilize daylight whenever possible in lieu of artificial light $519 $400
MA0084 #04 Y:1986 Use adjustable frequency drive or multiple speed motors on existing system $79,150 $34,500
MA0084 #03 Y:1986 Insulate bare equipment $2,610 $2,538
MA0084 #02 Y:1986 Use hot process fluids to preheat incoming process fluids $3,595 $8,225
MA0084 #01 Y:1986 Install compressor air intakes in coolest locations $713 $100
MA0083 #04 Y:1986 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $21,576 $62,000
MA0083 #03 Y:1986 Insulate bare equipment $1,084 $1,890
MA0083 #02 Y:1986 Install / repair insulation on condensate lines $219 $132
MA0083 #01 Y:1986 Utilize higher efficiency lamps and/or ballasts $17,912 $12,250
KU0216 #07 Y:1986 Install compressor air intakes in coolest locations $1,128 $200
KU0216 #06 Y:1986 Utilize energy-efficient belts and other improved mechanisms $1,562 -
KU0216 #05 Y:1986 Improve lubrication practices $2,386 $2,250