ITAC Assessment: KU0216
ITAC logo
ITAC Assessment: KU0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product DRY & CANNED PET FOOD
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area
n/a
Annual Production 180,000
ton
Production Hrs. Annual 5,400
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,081,576 21,917,937
kWh
Natural Gas $729,274 238,202
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,910

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $21,533 $20,000 - $21,533
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $13,014 $15,000 - $13,014
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $6,934 $9,000 - $6,934
-
MMBtu
04 2.6232: Install set-back timers $2,429 $683 $2,429
49,238
kWh
-
05 2.4312: Improve lubrication practices $2,386 $2,250 $2,386
48,359
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,562 - $1,562
31,653
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $1,128 $200 $1,128
22,860
kWh
-
TOTAL RECOMMENDED $48,986 $47,133 $7,505
152,110
kWh
$41,481
-
MMBtu
TOTAL IMPLEMENTED $27,910 $22,933 $6,377
129,250
kWh
$21,533
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs