Assessment Year | 2000 |
---|---|
Principal Product | Aluminum and Zinc die castings |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
40,000
ft2
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,767 | 1,878,957 |
kWh
|
$0.066 |
Electricity Demand | $97,266 | 6,192 |
kW-mo/yr
|
$15.71 |
Electricity Fees | $1,230 | - |
|
- |
Natural Gas | $141,732 | 24,462 |
MMBtu
|
$5.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $102,437 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $23,150 | $30,000 |
$7,799
118,113
kWh
|
$18,098
-
kW-mo/yr
|
$(-2,747.0)
-
MMBtu
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,624 | $8,000 | - | - |
$10,624
-
MMBtu
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,341 | $1,326 | - | - |
$4,341
-
MMBtu
|
- | - | - | |
04 | 2.2628: Utilize a less expensive cooling method | $1,824 | $1,500 | - | - |
$1,824
-
MMBtu
|
- | - | - | |
05 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $1,678 | $400 |
$1,678
25,498
kWh
|
- | - | - | - | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $6,528 | $13,000 | - | - | - |
$3,228
-
gal
|
- | $3,300 | |
07 | 3.4111: Use closed cycle process to minimize waste water production | $45,000 | $8,800 | - | - | - | - | $45,000 | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $9,292 | $11,000 | - | - | - | - | $9,292 | - | |
TOTAL RECOMMENDED | $102,437 | $74,026 |
$9,477
143,611
kWh
|
$18,098
-
kW-mo/yr
|
$14,042
-
MMBtu
|
$3,228
-
gal
|
$54,292 | $3,300 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs