ITAC Assessment: AS0076
ITAC logo
ITAC Assessment: AS0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product AIRCRAFT SEATING
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 2,700
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,851 1,948,124
kWh
Natural Gas $2,085 180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $27,862 $65,800 $35,855
381,594
kWh
$(-7,993.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $606 - $660
8,792
kWh
- $(-54.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,612 $12,391 $3,612
48,066
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $557 $2,128 $557
7,327
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $137 $250 $137
1,758
kWh
- -
06 2.7233: Use properly designed and sized hvac equipment $1,339 $2,035 $1,339
17,585
kWh
- -
07 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,191 $4,400 $2,191
29,015
kWh
- -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $15,260 $18,920 $15,260
202,521
kWh
- -
09 2.7221: Lower temperature during the winter season and vice-versa $6,126 - $6,126
81,184
kWh
- -
10 2.4133: Use most efficient type of electric motors $219 $329 $219
2,931
kWh
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $381 - $381
4,982
kWh
- -
TOTAL RECOMMENDED $58,290 $106,253 $66,337
785,755
kWh
$(-7,993.0)
-
MMBtu
$(-54.0)
TOTAL IMPLEMENTED $7,332 $329 $7,386
97,889
kWh
- $(-54.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs