| Assessment Year | 1995 |
|---|---|
| Principal Product | Flexible fiberglass furniture and school furniture |
| NAICS |
n/a
|
| SIC | 2519: Household Furniture, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 282 |
| Plant Area |
850,000
ft2
|
| Annual Production | 535,052
pieces
|
| Production Hrs. Annual | 4,685
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $451,068 | 6,845,252 |
kWh
|
$0.066 |
| Natural Gas | $153,474 | 39,604 |
MMBtu
|
$3.88 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,536 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,136 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $27,763 | - |
$27,763
-
kWh
|
- | - | |
| 02 | 2.2437: Recover waste heat from equipment | $2,960 | $6,524 | - |
$2,960
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $486 | $500 |
$486
16,120
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $267 | $125 | - |
$267
-
MMBtu
|
- | |
| 05 | 3.8314: Purchase high materials in returnable bulk containers | $10,410 | - | - | - |
$10,410
-
lb
|
|
| 06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,650 | - | - | - |
$1,650
-
lb
|
|
| TOTAL RECOMMENDED | $43,536 | $7,149 |
$28,249
16,120
kWh
|
$3,227
-
MMBtu
|
$12,060
-
lb
|
||
| TOTAL IMPLEMENTED | $2,136 | $500 |
$486
16,120
kWh
|
- |
$1,650
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs