ITAC Assessment: AM0235
ITAC logo
ITAC Assessment: AM0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Flexible fiberglass furniture and school furniture
NAICS
n/a
SIC 2519: Household Furniture, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 282
Plant Area 850,000
ft2
Annual Production 535,052
pieces
Production Hrs. Annual 4,685
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $451,068 6,845,252
kWh
Natural Gas $153,474 39,604
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $27,763 - $27,763
-
kWh
- -
02 2.2437: Recover waste heat from equipment $2,960 $6,524 - $2,960
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $486 $500 $486
16,120
kWh
- -
04 2.2511: Insulate bare equipment $267 $125 - $267
-
MMBtu
-
05 3.8314: Purchase high materials in returnable bulk containers $10,410 - - - $10,410
-
lb
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,650 - - - $1,650
-
lb
TOTAL RECOMMENDED $43,536 $7,149 $28,249
16,120
kWh
$3,227
-
MMBtu
$12,060
-
lb
TOTAL IMPLEMENTED $2,136 $500 $486
16,120
kWh
- $1,650
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs