ITAC Assessment: ND0286
ITAC logo
ITAC Assessment: ND0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Diesel Tubes
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 135,000
ft2
Annual Production 2,150,000
pieces
Production Hrs. Annual 5,700
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,100 3,603,165
kWh
Electricity Demand $32,451 3,701
kW-mo/yr
Natural Gas $47,003 11,537
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,378

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
01 4.322: Eliminate old stock and modify inventory control $21,000 $5,000 - - - - - - - $21,000 -
02 2.8112: Combine utility meters $14,973 $29,946 - - - - - - $14,973 - -
03 2.4133: Use most efficient type of electric motors $7,889 $10,720 $4,491
156,800
kWh
$3,398
-
kW-mo/yr
- - - - - - -
04 2.3212: Optimize plant power factor $5,505 $2,836 - - $5,505 - - - - - -
05 2.8121: Apply for tax-free status for energy purchases $1,841 $480 - - - - - - $1,841 - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,127 $300 $865
19,343
kWh
$262
-
kW-mo/yr
- - - - - - -
07 2.4221: Install compressor air intakes in coolest locations $1,059 $295 $825
18,464
kWh
$234
-
kW-mo/yr
- - - - - - -
08 4.652: Replace existing equipment with more suitable substitutes $502 $2,000 - - - - - - - - $502
09 4.652: Replace existing equipment with more suitable substitutes $502 $2,000 - - - - - - - - $502
10 2.7447: Install vinyl strip / high speed / air curtain doors $467 $1,782 - - - $467
-
MMBtu
- - - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $195 $440 $118
2,638
kWh
$77
-
kW-mo/yr
- - - - - - -
12 2.7447: Install vinyl strip / high speed / air curtain doors $347 $400 - - - $347
-
MMBtu
- - - - -
13 4.821: Pay bills on time to avoid late fees $54 - - - - - - - $54 - -
14 2.6218: Turn off equipment when not in use $47 - $47
879
kWh
- - - - - - - -
15 3.5316: Contract a wood pallet recycling company $2,625 - - - - - - $2,625
-
lb
- - -
16 3.5315: Lease / purchase baler; sell cardboard to recycler $888 $54 - - - - - $888
-
lb
- - -
17 3.8132: Use less toxic and volatile solvent substitutes $693 $44 - - - - $693
-
gal
- - - -
TOTAL RECOMMENDED $59,714 $56,297 $6,346
198,124
kWh
$3,971
-
kW-mo/yr
$5,505 $814
-
MMBtu
$693
-
gal
$3,513
-
lb
$16,868 $21,000 $1,004
TOTAL IMPLEMENTED $38,378 $23,195 $6,228
195,486
kWh
$3,894
-
kW-mo/yr
$5,505 - $693
-
gal
- $54 $21,000 $1,004
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs