| Assessment Year | 1987 |
|---|---|
| Principal Product | EXTRUDED PLASTIC PELLETS |
| NAICS |
n/a
|
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 20,000,000
lb
|
| Production Hrs. Annual | 8,064
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $459,878 | 5,847,890 |
kWh
|
$0.079 |
| Natural Gas | $83,826 | 19,213 |
MMBtu
|
$4.36 |
| Fuel Oil #4 | $61,010 | 22,032 |
MMBtu
|
$2.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $87,165 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $83,051 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $713 | $100 |
$713
9,086
kWh
|
- | - | |
| 02 | 2.2444: Use hot process fluids to preheat incoming process fluids | $3,595 | $8,225 | - |
$3,595
-
MMBtu
|
- | |
| 03 | 2.2511: Insulate bare equipment | $2,610 | $2,538 | - | - |
$2,610
-
MMBtu
|
|
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $79,150 | $34,500 |
$79,150
1,007,034
kWh
|
- | - | |
| 05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $519 | $400 |
$519
6,741
kWh
|
- | - | |
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $578 | $200 |
$578
7,327
kWh
|
- | - | |
| TOTAL RECOMMENDED | $87,165 | $45,963 |
$80,960
1,030,188
kWh
|
$3,595
-
MMBtu
|
$2,610
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $83,051 | $37,338 |
$80,441
1,023,447
kWh
|
- |
$2,610
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #4 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs