| Assessment Year | 2026 |
|---|---|
| Principal Product | PEX A Pipe |
| NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
| SIC | 3084: Plastics Pipe |
| Sales Range | greater than $500 M |
| # of Employees | 90 |
| Plant Area |
179,261
ft2
|
| Annual Production | 6,811
ton
|
| Production Hrs. Annual | 8,424
hrs
|
| Location (State) | Minnesota |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $820,513 | 14,144,478 |
kWh
|
$0.058 | |
| Electricity Demand | $277,671 | 26,050 |
kW-mo/yr
|
$10.66 | |
| Electricity Fees | $34,608 | - |
|
- | |
| Natural Gas | $37,457 | 4,901 |
MMBtu
|
$7.64 | |
| Waste Disposal Costs | |||||
| Water Usage | $24,083 | 3,572 |
Tgal
|
$6.74 | |
| Water Disposal | $8,851 | 758 |
Tgal
|
$11.68 | |
| TOTAL YEARLY COSTS | $1,203,183 | ||||
| RECOMMENDED SAVINGS* | $56,424 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2613: Use antifreeze in cooling towers to allow winter use | $27,625 | $19,139 | - | - | - | $27,625 | |
| 02 | 2.2491: Use cooling air which cools hot work pieces for space heating | $14,873 | $10,258 | - | - |
$14,873
-
MMBtu
|
- | |
| 03 | 2.4323: Use optimum size and capacity equipment | $9,367 | $29,591 |
$7,424
128,000
kWh
|
$1,943
-
kW-mo/yr
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,409 | $210 |
$2,702
46,578
kWh
|
$708
-
kW-mo/yr
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,150 | $5,288 |
$1,125
19,388
kWh
|
$25
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $56,424 | $64,486 |
$11,251
193,966
kWh
|
$2,675
-
kW-mo/yr
|
$14,873
-
MMBtu
|
$27,625 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs