ITAC Assessment: WM0256
ITAC logo
ITAC Assessment: WM0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product PEX A Pipe
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range greater than $500
M
# of Employees 90
Plant Area 179,261
ft2
Annual Production 6,811
ton
Production Hrs. Annual 8,424
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $820,513 14,144,478
kWh
Electricity Demand $277,671 26,050
kW-mo/yr
Electricity Fees $34,608 -
Natural Gas $37,457 4,901
MMBtu
Waste Disposal Costs
Water Usage $24,083 3,572
Tgal
Water Disposal $8,851 758
Tgal
TOTAL YEARLY COSTS $1,203,183
RECOMMENDED SAVINGS* $56,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2613: Use antifreeze in cooling towers to allow winter use $27,625 $19,139 - - - $27,625
02 2.2491: Use cooling air which cools hot work pieces for space heating $14,873 $10,258 - - $14,873
-
MMBtu
-
03 2.4323: Use optimum size and capacity equipment $9,367 $29,591 $7,424
128,000
kWh
$1,943
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,409 $210 $2,702
46,578
kWh
$708
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $1,150 $5,288 $1,125
19,388
kWh
$25
-
kW-mo/yr
- -
TOTAL RECOMMENDED $56,424 $64,486 $11,251
193,966
kWh
$2,675
-
kW-mo/yr
$14,873
-
MMBtu
$27,625
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs