ITAC Assessment: UU0071
ITAC logo
ITAC Assessment: UU0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product chelated minerals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area
n/a
Annual Production 1,000,000
lb
Production Hrs. Annual 4,940
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,497 739,280
kWh
Electricity Demand $32,051 3,732
kW-mo/yr
Natural Gas $40,456 6,556
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,544

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $3,645 $2,000 - $3,645
-
kW-mo/yr
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,294 - - $3,294
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $1,655 $3,894 $1,021
31,632
kWh
$634
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $1,950 $400 - - $1,950
-
MMBtu
05 2.7134: Use photocell controls $2,376 $2,400 $479
14,976
kWh
$1,897
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,920 $8,694 $1,500
46,608
kWh
$9,470
-
kW-mo/yr
$1,950
-
MMBtu
TOTAL IMPLEMENTED $10,544 $6,294 $1,021
31,632
kWh
$7,573
-
kW-mo/yr
$1,950
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs