| Assessment Year | 1997 |
|---|---|
| Principal Product | industrial fuses |
| NAICS |
n/a
|
| SIC | 3613: Switchgear and Switchboard Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 235 |
| Plant Area |
36,000
ft2
|
| Annual Production | 13,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $74,357 | 1,906,506 |
kWh
|
$0.039 |
| Electricity Demand | $52,700 | 4,527 |
kW-mo/yr
|
$11.64 |
| Electricity Fees | $324 | - |
|
- |
| Natural Gas | $5,668 | 1,011 |
MMBtu
|
$5.61 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,522 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,685 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $3,003 | $2,400 | - | - |
$3,003
-
MMBtu
|
- | - | - | - | - | |
| 02 | 2.7135: Install occupancy sensors | $1,894 | $390 |
$1,137
33,705
kWh
|
$757
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $902 | $300 |
$556
16,413
kWh
|
$346
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $484 | $1,510 |
$324
9,672
kWh
|
$160
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $464 | $660 |
$279
8,206
kWh
|
$185
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $286 | - |
$286
8,499
kWh
|
- | - | - | - | - | - | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $9,514 | $7,500 | - | - | - | - |
$5,830
-
lb
|
$(-980.0) | $4,664 | - | |
| 08 | 3.4151: Minimize water usage | $4,425 | $1,375 | - | - | - |
$4,425
-
Tgal
|
- | - | - | - | |
| 09 | 3.5316: Contract a wood pallet recycling company | $1,040 | $420 | - | - | - | - | - | $520 | - | $520 | |
| 10 | 4.441: Install automatic packing equipment | $3,510 | $8,000 | - | - | - | - | - | $3,510 | - | - | |
| TOTAL RECOMMENDED | $25,522 | $22,555 |
$2,582
76,495
kWh
|
$1,448
-
kW-mo/yr
|
$3,003
-
MMBtu
|
$4,425
-
Tgal
|
$5,830
-
lb
|
$3,050 | $4,664 | $520 | ||
| TOTAL IMPLEMENTED | $7,685 | $2,725 |
$1,972
58,324
kWh
|
$1,288
-
kW-mo/yr
|
- |
$4,425
-
Tgal
|
- | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs