ITAC Assessment: BD0098
ITAC logo
ITAC Assessment: BD0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product industrial fuses
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $10
M
to 50
M
# of Employees 235
Plant Area 36,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,357 1,906,506
kWh
Electricity Demand $52,700 4,527
kW-mo/yr
Electricity Fees $324 -
Natural Gas $5,668 1,011
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $3,003 $2,400 - - $3,003
-
MMBtu
- - - - -
02 2.7135: Install occupancy sensors $1,894 $390 $1,137
33,705
kWh
$757
-
kW-mo/yr
- - - - - -
03 2.4221: Install compressor air intakes in coolest locations $902 $300 $556
16,413
kWh
$346
-
kW-mo/yr
- - - - - -
04 2.4133: Use most efficient type of electric motors $484 $1,510 $324
9,672
kWh
$160
-
kW-mo/yr
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $464 $660 $279
8,206
kWh
$185
-
kW-mo/yr
- - - - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $286 - $286
8,499
kWh
- - - - - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $9,514 $7,500 - - - - $5,830
-
lb
$(-980.0) $4,664 -
08 3.4151: Minimize water usage $4,425 $1,375 - - - $4,425
-
Tgal
- - - -
09 3.5316: Contract a wood pallet recycling company $1,040 $420 - - - - - $520 - $520
10 4.441: Install automatic packing equipment $3,510 $8,000 - - - - - $3,510 - -
TOTAL RECOMMENDED $25,522 $22,555 $2,582
76,495
kWh
$1,448
-
kW-mo/yr
$3,003
-
MMBtu
$4,425
-
Tgal
$5,830
-
lb
$3,050 $4,664 $520
TOTAL IMPLEMENTED $7,685 $2,725 $1,972
58,324
kWh
$1,288
-
kW-mo/yr
- $4,425
-
Tgal
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs