ITAC Assessment: MO0129
ITAC logo
ITAC Assessment: MO0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Candy
NAICS
n/a
SIC 2064: Candy and Other Confectionery Products
Sales Range $50
M
to 100
M
# of Employees 264
Plant Area 114,246
ft2
Annual Production 28,000,000
lb
Production Hrs. Annual 7,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $345,372 5,986,518
kWh
Natural Gas $122,116 29,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,052 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,362 $22,502 $9,362
162,368
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,866 $1,246 $4,866
84,408
kWh
- -
03 2.4133: Use most efficient type of electric motors $10,244 $12,788 $10,244
177,608
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,616 $300 $1,616
28,136
kWh
- -
05 3.4114: Replace city water with recycled water via cooling tower $2,299 $1,500 $(-1,211.0)
(-21,102)
kWh
- $3,510
-
Tgal
06 2.4221: Install compressor air intakes in coolest locations $1,363 $328 $1,363
23,740
kWh
- -
07 2.4314: Use synthetic lubricant $969 $80 $969
16,706
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $967 $995 - $967
-
MMBtu
-
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $366 $1,078 $528
9,086
kWh
$(-162.0)
-
MMBtu
-
TOTAL RECOMMENDED $32,052 $40,817 $27,737
480,950
kWh
$805
-
MMBtu
$3,510
-
Tgal
TOTAL IMPLEMENTED $16,560 $24,156 $16,560
287,222
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs