ITAC Assessment: OK0217
ITAC logo
ITAC Assessment: OK0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CRAYONS & ART SUPPLIES
NAICS
n/a
SIC 3952: Lead Pencils, Crayons, and Artists' Materials
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,543 7,266,999
kWh
Natural Gas $115,374 33,283
MMBtu
Fuel Oil #6 $38,994 15,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,691

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $1,521 $4,450 $1,384
23,740
kWh
$(-35.0)
-
MMBtu
- $172
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,326 $2,808 $1,328
23,447
kWh
$(-2.0)
-
MMBtu
- -
03 2.2122: Install / repair insulation on condensate lines $2,969 $9,033 - $1,700
-
MMBtu
$1,269
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,396 $1,000 - $1,016
-
MMBtu
$380
-
MMBtu
-
TOTAL RECOMMENDED $7,212 $17,291 $2,712
47,187
kWh
$2,679
-
MMBtu
$1,649
-
MMBtu
$172
TOTAL IMPLEMENTED $5,691 $12,841 $1,328
23,447
kWh
$2,714
-
MMBtu
$1,649
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs