ITAC Assessment: OR0303
ITAC logo
ITAC Assessment: OR0303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Steel Shelving
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,772
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,752 622,509
kWh
Electricity Demand $11,230 3,612
kW-mo/yr
Electricity Fees $3,305 -
Natural Gas $21,700 5,967
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,726 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,120 $250 $930
27,843
kWh
$380
-
kW-mo/yr
$(-190.0)
-
MMBtu
- -
02 2.4224: Upgrade controls on compressors $3,730 $1,300 $2,480
74,443
kWh
$1,250
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $490 $1,000 $350
10,551
kWh
$140
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $606 $2,109 $501
14,947
kWh
$105
-
kW-mo/yr
- - -
05 4.514: Re-arrange equipment layout to reduce handling costs $4,030 $1,400 - - - - $4,030
06 4.432: Cross-train personnel to avoid lost time $34,750 $69,300 - - - $34,750 -
TOTAL RECOMMENDED $44,726 $75,359 $4,261
127,784
kWh
$1,875
-
kW-mo/yr
$(-190.0)
-
MMBtu
$34,750 $4,030
TOTAL IMPLEMENTED $44,726 $75,359 $4,261
127,784
kWh
$1,875
-
kW-mo/yr
$(-190.0)
-
MMBtu
$34,750 $4,030
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs