ITAC Assessment: LM0058
ITAC logo
ITAC Assessment: LM0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product knitted, dyed and printed fabrics
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 150,000
ft2
Annual Production 22,072,309
lb
Production Hrs. Annual 5,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $541,949 11,333,467
kWh
Electricity Demand $245,797 26,184
kW-mo/yr
Electricity Fees $11,605 -
Natural Gas $980,672 270,905
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,225

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7131: Add area lighting switches $6,786 $7,274 $5,764
119,197
kWh
$1,022
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,174 $250 $4,811
99,850
kWh
$1,143
-
kW-mo/yr
- $(-780.0)
03 2.2414: Use waste heat from hot flue gases to preheat $12,012 $18,500 - - $12,012
-
MMBtu
-
04 2.2511: Insulate bare equipment $6,265 $2,028 - - $6,265
-
MMBtu
-
05 4.122: Develop standard procedures to improve internal yields $20,000 $19,260 n/a - - - $20,000
TOTAL RECOMMENDED $50,237 $47,312 $10,575
219,047
kWh
$2,165
-
kW-mo/yr
$18,277
-
MMBtu
$19,220
TOTAL IMPLEMENTED $18,225 $9,552 $10,575
219,047
kWh
$2,165
-
kW-mo/yr
$6,265
-
MMBtu
$(-780.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs