ITAC Assessment: OK0216
ITAC logo
ITAC Assessment: OK0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COMBUSTION BURNERS
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 4,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,872 1,196,366
kWh
Natural Gas $52,782 13,913
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $8,049 $1,300 $(-3,776.0)
(-59,789)
kWh
$11,825
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $4,180 $2,250 - $4,180
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $753 - $813
16,413
kWh
- $(-60.0)
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $97 $60 $97
1,465
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,363 $5,742 $3,757
102,579
kWh
$(-394.0)
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,905 - $3,182
73,271
kWh
$(-277.0)
-
MMBtu
-
TOTAL RECOMMENDED $19,347 $9,352 $4,073
133,939
kWh
$15,334
-
MMBtu
$(-60.0)
TOTAL IMPLEMENTED $11,298 $8,052 $7,849
193,728
kWh
$3,509
-
MMBtu
$(-60.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs