| Assessment Year | 2015 |
|---|---|
| Principal Product | Corrugated paper boxes |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | less than $500 k |
| # of Employees | 150 |
| Plant Area |
175,000
ft2
|
| Annual Production | 80,001
units
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $79,276 | 1,096,327 |
kWh
|
$0.072 |
| Electricity Demand | $62,893 | 2,673 |
kW-mo/yr
|
$23.53 |
| Electricity Fees | $6,290 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $72,365 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $66,819 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7232: Replace existing hvac unit with high efficiency model | $43,186 | $113,400 |
$18,259
252,533
kWh
|
$24,927
-
kW-mo/yr
|
|
| 02 | 2.7135: Install occupancy sensors | $10,851 | $12,449 |
$10,851
150,081
kWh
|
- | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $9,239 | $7,006 |
$6,072
83,965
kWh
|
$3,167
-
kW-mo/yr
|
|
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,546 | $18,500 | - |
$5,546
-
kW-mo/yr
|
|
| 05 | 2.7134: Use photocell controls | $2,674 | $2,420 |
$2,120
29,319
kWh
|
$554
-
kW-mo/yr
|
|
| 06 | 2.7132: Install timers on light switches in little used areas | $869 | $1,356 |
$695
9,608
kWh
|
$174
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $72,365 | $155,131 |
$37,997
525,506
kWh
|
$34,368
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $66,819 | $136,631 |
$37,997
525,506
kWh
|
$28,822
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs