Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,591

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0898 #04 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $4,223 $8,011
GT0898 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $8,648 $9,390
GT0898 #02 Y:2017 Meter waste water $38,607 $18,000
GT0898 #01 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $1,203 $150
AS0440 #05 Y:2017 Turn off equipment when not in use $1,136 $100
AS0440 #04 Y:2017 Reduce fluid flow rates $892 $920
AS0440 #03 Y:2017 Use gravity feeds wherever possible $8,594 $13,600
AS0440 #02 Y:2017 Install compressor air intakes in coolest locations $315 $500
AS0440 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $11,622 $15,120
UM0488 #05 Y:2017 Install occupancy sensors $1,958 $2,400
UM0488 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $14,992 $8,978
UM0488 #03 Y:2017 Install compressor air intakes in coolest locations $931 $1,500
UM0488 #02 Y:2017 Use or replace with energy efficient substitutes $2,383 $300
UM0488 #01 Y:2017 Reduce the pressure of compressed air to the minimum required $2,972 $3,000
SD0550 #05 Y:2017 Use waste heat from hot flue gases to preheat $2,077 $9,750
SD0550 #04 Y:2017 Reduce the pressure of compressed air to the minimum required $3,945 $600
SD0550 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $9,225 $2,500
SD0550 #02 Y:2017 Use closed cycle process to minimize waste water production $119,615 $210,000
SD0550 #01 Y:2017 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $526,998 $1,348,560
UK1615 #04 Y:2017 Install occupancy sensors $1,711 $3,465