ITAC Assessment: UM0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Injection Molded Automotive Assemblies
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 150,000
ft2
Annual Production 42,913,338
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $441,512 8,843,946
kWh
Electricity Demand $395,865 20,650
kW-mo/yr
Natural Gas $41,083 7,362
MMBtu
TOTAL YEARLY COSTS $878,460
RECOMMENDED SAVINGS* $23,236 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,972 $3,000 $1,682
33,648
kWh
$1,290
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $2,383 $300 $2,383
47,659
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $931 $1,500 $931
18,614
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,992 $8,978 $8,415
168,300
kWh
$6,577
-
kW-mo/yr
05 2.7135: Install occupancy sensors $1,958 $2,400 $1,958
39,168
kWh
-
TOTAL RECOMMENDED $23,236 $16,178 $15,369
307,389
kWh
$7,867
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs