ITAC Assessment: UU0117
ITAC logo
ITAC Assessment: UU0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Guidance Systems
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $100
M
to 500
M
# of Employees 550
Plant Area 278,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 8,424
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $740,863 19,696,800
kWh
Electricity Demand $38,866 2,932
kW-mo/yr
Electricity Fees $167,452 -
Natural Gas $232,120 39,873
MMBtu
Waste Disposal Costs
Water Usage $54,440 10,079
Tgal
TOTAL YEARLY COSTS $1,233,740
RECOMMENDED SAVINGS* $155,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,808

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $57,965 $96,413 $33,753
888,234
kWh
$17,816
-
kW-mo/yr
$6,396 -
02 2.7144: Install spectral reflectors / delamp $34,105 $2,426 $20,676
544,093
kWh
$9,882
-
kW-mo/yr
$3,548 -
03 2.5194: Redesign process $25,877 $35,010 $15,624
413,383
kWh
$7,544
-
kW-mo/yr
$2,709 -
04 2.1233: Analyze flue gas for proper air/fuel ratio $21,087 $100 - - - $21,087
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,843 $1,647 $7,180
188,937
kWh
$3,431
-
kW-mo/yr
$1,232 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,522 - $2,333
61,401
kWh
$875
-
kW-mo/yr
$314 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $779 $1,695 $341
8,979
kWh
$322
-
kW-mo/yr
$116 -
TOTAL RECOMMENDED $155,178 $137,292 $79,906
2,105,027
kWh
$39,870
-
kW-mo/yr
$14,315 $21,087
-
MMBtu
TOTAL IMPLEMENTED $69,808 $98,060 $40,933
1,077,171
kWh
$21,247
-
kW-mo/yr
$7,628 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs