ITAC Assessment: UK1615
ITAC logo
ITAC Assessment: UK1615
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Waste WAter
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 12
Plant Area 160,000
ft2
Annual Production 9,490,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,783 3,044,640
kWh
Electricity Demand $78,038 5,601
kW-mo/yr
Electricity Fees $3,808 -
TOTAL YEARLY COSTS $178,629
RECOMMENDED SAVINGS* $89,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,059

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $84,940 $369,150 $51,341
1,604,427
kWh
$33,599
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,144 - $2,144
67,000
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,204 $4,290 $1,204
37,624
kWh
-
04 2.7135: Install occupancy sensors $1,711 $3,465 $1,711
53,483
kWh
-
TOTAL RECOMMENDED $89,999 $376,905 $56,400
1,762,534
kWh
$33,599
-
kW-mo/yr
TOTAL IMPLEMENTED $5,059 $7,755 $5,059
158,107
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs