ITAC Assessment: GT0898
ITAC logo
ITAC Assessment: GT0898
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Gypsum products
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 33
Plant Area 50,000
ft2
Annual Production 186,500
units
Production Hrs. Annual 4,250
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,943 1,015,260
kWh
Natural Gas $8,079 366
MMBtu
TOTAL YEARLY COSTS $128,022
RECOMMENDED SAVINGS* $95,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,255

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,203 $150 $1,203
10,029
kWh
-
02 3.4155: Meter waste water $38,607 $18,000 - $38,607
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,648 $9,390 $8,648
72,055
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,223 $8,011 $4,223
35,794
kWh
-
05 2.9113: Use solar heat for heat $42,901 $150,153 $42,901
363,578
kWh
-
TOTAL RECOMMENDED $95,582 $185,704 $56,975
481,456
kWh
$38,607
TOTAL IMPLEMENTED $47,255 $27,390 $8,648
72,055
kWh
$38,607
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs