Assessment Year | 2017 |
---|---|
Principal Product | Dyed Textiles |
NAICS | 313310: Textile and Fabric Finishing Mills |
SIC | 2253: Knit Outerwear Mills |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
66,000
ft2
|
Annual Production | 500,000
units
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,540,249 | 14,012,111 |
kWh
|
$0.11 | |
Electricity Demand | $538,379 | 36,239 |
kW-mo/yr
|
$14.86 | |
Electricity Fees | $35,853 | - |
|
- | |
Natural Gas | $594,020 | 423,079 |
MMBtu
|
$1.40 | |
Waste Disposal Costs | |||||
Water Usage | $934,500 | 350,000 |
Tgal
|
$2.67 | |
TOTAL YEARLY COSTS | $3,643,001 | ||||
RECOMMENDED SAVINGS* | $661,860 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $128,840 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $526,998 | $1,348,560 |
$541,236
4,924,800
kWh
|
$106,992
-
kW-mo/yr
|
$(-98,496.0) |
$(-22,734.0)
-
MMBtu
|
- | |
02 | 3.4111: Use closed cycle process to minimize waste water production | $119,615 | $210,000 |
$(-17,309.0)
(-157,500)
kWh
|
$(-3,251.0)
-
kW-mo/yr
|
- | - |
$140,175
-
Tgal
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,225 | $2,500 |
$9,225
83,942
kWh
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,945 | $600 |
$3,945
35,900
kWh
|
- | - | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,077 | $9,750 | - | - | - |
$2,077
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $661,860 | $1,571,410 |
$537,097
4,887,142
kWh
|
$103,741
-
kW-mo/yr
|
$(-98,496.0) |
$(-20,657.0)
-
MMBtu
|
$140,175
-
Tgal
|
||
TOTAL IMPLEMENTED | $128,840 | $212,500 |
$(-8,084.0)
(-73,558)
kWh
|
$(-3,251.0)
-
kW-mo/yr
|
- | - |
$140,175
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs