Assessment Year | 1993 |
---|---|
Principal Product | petroleum pipe insulation |
NAICS |
n/a
|
SIC | 3292: Asbestos Products |
Sales Range | $5 M to 10M |
# of Employees | 0 |
Plant Area |
64,000
ft2
|
Annual Production | 300,000
thousand feet
|
Production Hrs. Annual | 2,900
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,858 | 976,260 |
kWh
|
$0.055 |
LPG | $9,205 | 946 |
MMBtu
|
$9.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,410 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,300 | $112 |
$5,300
50,410
kWh
|
|
02 | 2.3212: Optimize plant power factor | $4,110 | $8,000 |
$4,110
-
kWh
|
|
03 | 2.4226: Use / purchase optimum sized compressor | $3,600 | - |
$3,600
37,222
kWh
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,280 | $7,390 |
$3,280
37,808
kWh
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $550 | $22 |
$550
5,275
kWh
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $280 | - |
$280
11,137
kWh
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $120 | - |
$120
4,689
kWh
|
|
TOTAL RECOMMENDED | $17,240 | $15,524 |
$17,240
146,541
kWh
|
||
TOTAL IMPLEMENTED | $13,410 | $8,112 |
$13,410
103,458
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs