| Assessment Year | 1993 |
|---|---|
| Principal Product | petroleum pipe insulation |
| NAICS |
n/a
|
| SIC | 3292: Asbestos Products |
| Sales Range | $5 M to 10M |
| # of Employees | 0 |
| Plant Area |
64,000
ft2
|
| Annual Production | 300,000
thousand feet
|
| Production Hrs. Annual | 2,900
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $53,858 | 976,260 |
kWh
|
$0.055 |
| LPG | $9,205 | 946 |
MMBtu
|
$9.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,240 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,410 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,300 | $112 |
$5,300
50,410
kWh
|
|
| 02 | 2.3212: Optimize plant power factor | $4,110 | $8,000 |
$4,110
-
kWh
|
|
| 03 | 2.4226: Use / purchase optimum sized compressor | $3,600 | - |
$3,600
37,222
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,280 | $7,390 |
$3,280
37,808
kWh
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $550 | $22 |
$550
5,275
kWh
|
|
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $280 | - |
$280
11,137
kWh
|
|
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $120 | - |
$120
4,689
kWh
|
|
| TOTAL RECOMMENDED | $17,240 | $15,524 |
$17,240
146,541
kWh
|
||
| TOTAL IMPLEMENTED | $13,410 | $8,112 |
$13,410
103,458
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs