Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,847

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0455 #02 Y:2018 Reduce the pressure of compressed air to the minimum required $6,768 $800
AS0455 #01 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $7,307 $180
SD0567 #05 Y:2018 Reduce the pressure of compressed air to the minimum required $65 $150
SD0567 #04 Y:2018 Install occupancy sensors $266 $1,260
SD0567 #03 Y:2018 Use most efficient type of electric motors $1,791 $5,959
SD0567 #02 Y:2018 Use photocell controls $2,229 $3,700
SD0567 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $7,287 $10,520
NC0612 #06 Y:2018 Change rate schedules or other changes in utility service $42,360 $500
NC0612 #05 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $4,028 $200
NC0612 #04 Y:2018 Make a practice of turning off lights when not needed $14,909 $500
NC0612 #03 Y:2018 Install occupancy sensors $467 $150
NC0612 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $36,235 $215,800
NC0612 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $3,709 $16,988
SF0523 #03 Y:2018 Utilize higher efficiency lamps and/or ballasts $35,710 $163,709
SF0523 #02 Y:2018 Install / repair insulation on steam lines $1,653 $386
SF0523 #01 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $872 $204
UA0195 #06 Y:2018 Use waste heat from hot flue gases to preheat $15,967 $70,000
UA0195 #05 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $2,589 $2,465
UA0195 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $6,476 $500
UA0195 #03 Y:2018 Use / purchase optimum sized compressor $18,189 $19,100