ITAC Assessment: SF0523
ITAC logo
ITAC Assessment: SF0523
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Energetic Devices for Aircraft, Rockets, and Launch Devices
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 180,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 2,678
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,293 2,360,427
kWh
Electricity Demand $188,726 7,452
kW-mo/yr
Fuel Oil #1 $58,361 2,441
MMBtu
TOTAL YEARLY COSTS $506,380
RECOMMENDED SAVINGS* $38,235 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,235

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $872 $204 $872
7,941
kWh
- - - -
02 2.2136: Install / repair insulation on steam lines $1,653 $386 - - $1,653
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $35,710 $163,709 $18,391
167,418
kWh
$16,557
-
kW-mo/yr
- $1,987 $(-1,225.0)
TOTAL RECOMMENDED $38,235 $164,299 $19,263
175,359
kWh
$16,557
-
kW-mo/yr
$1,653
-
MMBtu
$1,987 $(-1,225.0)
TOTAL IMPLEMENTED $38,235 $164,299 $19,263
175,359
kWh
$16,557
-
kW-mo/yr
$1,653
-
MMBtu
$1,987 $(-1,225.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs