ITAC Assessment: AM0670
ITAC logo
ITAC Assessment: AM0670
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Machining job shop
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 42,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 3,368
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,079 420,248
kWh
Electricity Demand $12,431 1,998
kW-mo/yr
Electricity Fees $3,215 -
LPG $10,882 395
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,810 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,260 $10,630 $4,100
63,200
kWh
$1,160
-
kW-mo/yr
- - -
02 2.4239: Eliminate or reduce compressed air usage $3,160 $1,190 $2,460
37,800
kWh
$700
-
kW-mo/yr
- - -
03 2.8121: Apply for tax-free status for energy purchases $14,335 $3,000 - - $2,867 - $11,468
04 2.7124: Make a practice of turning off lights when not needed $1,850 $660 $1,440
22,176
kWh
$410
-
kW-mo/yr
- - -
05 2.3134: Shift from daytime to nighttime operation $1,680 - - $1,680
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $830 $8 $590
9,080
kWh
$240
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $645 $355 $50
770
kWh
$15
-
kW-mo/yr
- $580 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $550 $810 $450
6,940
kWh
$100
-
kW-mo/yr
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $500 $200 $390
6,040
kWh
$110
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $28,810 $16,853 $9,480
146,006
kWh
$4,415
-
kW-mo/yr
$2,867 $580 $11,468
TOTAL IMPLEMENTED $12,795 $13,853 $9,480
146,006
kWh
$2,735
-
kW-mo/yr
- $580 -