ITAC Assessment: SD0567
ITAC logo
ITAC Assessment: SD0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Printed Materials
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area 50,000
ft2
Annual Production 45,000,000
units
Production Hrs. Annual 5,049
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,730 677,811
kWh
Electricity Demand $50,020 2,419
kW-mo/yr
Electricity Fees $8,062 -
Natural Gas $2,570 280
MMBtu
TOTAL YEARLY COSTS $152,382
RECOMMENDED SAVINGS* $11,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,122

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,287 $10,520 $5,175
38,254
kWh
$2,056
-
kW-mo/yr
$56
02 2.7134: Use photocell controls $2,229 $3,700 $2,114
15,624
kWh
$115
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $1,791 $5,959 $1,791
13,237
kWh
- -
04 2.7135: Install occupancy sensors $266 $1,260 $266
1,966
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $65 $150 $65
483
kWh
- -
TOTAL RECOMMENDED $11,638 $21,589 $9,411
69,564
kWh
$2,171
-
kW-mo/yr
$56
TOTAL IMPLEMENTED $2,122 $7,369 $2,122
15,686
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs