Assessment Year | 2000 |
---|---|
Principal Product | Frame parts for furniture |
NAICS |
n/a
|
SIC | 2512: Wood Household Furniture, Upholstered |
Sales Range | $1 M to 5M |
# of Employees | 54 |
Plant Area |
105,000
ft2
|
Annual Production | 3,000
thousand feet
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,675 | 3,355,510 |
kWh
|
$0.047 |
Electricity Demand | $26,990 | 8,937 |
kW-mo/yr
|
$3.02 |
Electricity Fees | $5,224 | - |
|
- |
Natural Gas | $11,781 | 1,758 |
MMBtu
|
$6.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,824 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,826 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $600 | $440 |
$503
10,551
kWh
|
$97
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $526 | $1,623 |
$422
8,972
kWh
|
$104
-
kW-mo/yr
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,067 | $6,800 |
$1,495
31,653
kWh
|
$572
-
kW-mo/yr
|
- | - | - | |
04 | 2.2491: Use cooling air which cools hot work pieces for space heating | $2,795 | $1,500 | - | - |
$2,795
-
MMBtu
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,106 | $500 |
$953
20,223
kWh
|
$153
-
kW-mo/yr
|
- | - | - | |
06 | 2.4225: Install common header on compressors | $15,323 | $2,200 |
$13,214
279,308
kWh
|
$2,109
-
kW-mo/yr
|
- | - | - | |
07 | 3.6123: Burn wood by-products for heat | $3,120 | - |
$(-73.0)
(-1,465)
kWh
|
- |
$2,117
-
MMBtu
|
$1,276
-
lb
|
$(-200.0) | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $26,287 | $960 |
$16,687
352,872
kWh
|
- | - | - | $9,600 | |
TOTAL RECOMMENDED | $51,824 | $14,023 |
$33,201
702,114
kWh
|
$3,035
-
kW-mo/yr
|
$4,912
-
MMBtu
|
$1,276
-
lb
|
$9,400 | ||
TOTAL IMPLEMENTED | $4,826 | $940 |
$1,383
29,309
kWh
|
$250
-
kW-mo/yr
|
$2,117
-
MMBtu
|
$1,276
-
lb
|
$(-200.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs