ITAC Assessment: NC0188
ITAC logo
ITAC Assessment: NC0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Frame parts for furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $1
M
to 5
M
# of Employees 54
Plant Area 105,000
ft2
Annual Production 3,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,675 3,355,510
kWh
Electricity Demand $26,990 8,937
kW-mo/yr
Electricity Fees $5,224 -
Natural Gas $11,781 1,758
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $600 $440 $503
10,551
kWh
$97
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $526 $1,623 $422
8,972
kWh
$104
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,067 $6,800 $1,495
31,653
kWh
$572
-
kW-mo/yr
- - -
04 2.2491: Use cooling air which cools hot work pieces for space heating $2,795 $1,500 - - $2,795
-
MMBtu
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,106 $500 $953
20,223
kWh
$153
-
kW-mo/yr
- - -
06 2.4225: Install common header on compressors $15,323 $2,200 $13,214
279,308
kWh
$2,109
-
kW-mo/yr
- - -
07 3.6123: Burn wood by-products for heat $3,120 - $(-73.0)
(-1,465)
kWh
- $2,117
-
MMBtu
$1,276
-
lb
$(-200.0)
08 4.111: Add equipment/ operators to reduce production bottleneck $26,287 $960 $16,687
352,872
kWh
- - - $9,600
TOTAL RECOMMENDED $51,824 $14,023 $33,201
702,114
kWh
$3,035
-
kW-mo/yr
$4,912
-
MMBtu
$1,276
-
lb
$9,400
TOTAL IMPLEMENTED $4,826 $940 $1,383
29,309
kWh
$250
-
kW-mo/yr
$2,117
-
MMBtu
$1,276
-
lb
$(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs