ITAC Assessment: OK0108
ITAC logo
ITAC Assessment: OK0108
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product PORCELAIN WALL PANELS
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 8,000
thousand feet
Production Hrs. Annual 5,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,579 2,216,882
kWh
Natural Gas $188,702 55,078
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $3,912 $11,990 - $3,912
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $5,027 $700 - $5,027
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,117 $22,000 $13,117
325,615
kWh
-
04 2.3212: Optimize plant power factor $596 $1,640 $596
-
kWh
-
05 2.7261: Install timers and/or thermostats $203 $296 - $203
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $102 $142 $102
2,052
kWh
-
TOTAL RECOMMENDED $22,957 $36,768 $13,815
327,667
kWh
$9,142
-
MMBtu
TOTAL IMPLEMENTED $22,361 $35,128 $13,219
327,667
kWh
$9,142
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs