ITAC Assessment: AS0455
ITAC logo
ITAC Assessment: AS0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Commercial paper rolls
NAICS 322230: Stationery Product Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 20,000
ft2
Annual Production 900,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,709 736,800
kWh
Electricity Demand $17,468 2,441
kW-mo/yr
Electricity Fees $3,317 -
Other Gas $18,000 697
MMBtu
TOTAL YEARLY COSTS $119,494
RECOMMENDED SAVINGS* $174,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $150,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,307 $180 $6,491
59,280
kWh
$816
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,768 $800 $6,012
54,912
kWh
$756
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $18,097 $36,012 $16,030
146,388
kWh
$2,067
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,551 $12,598 $10,551
96,353
kWh
- - -
05 4.111: Add equipment/ operators to reduce production bottleneck $114,480 $30,000 $3,160
28,875
kWh
- - $111,320
06 4.131: Modify process to reduce material use/cost $1,556 - $201
1,835
kWh
- - $1,355
07 4.821: Pay bills on time to avoid late fees $15,576 - - - $15,576 -
TOTAL RECOMMENDED $174,335 $79,590 $42,445
387,643
kWh
$3,639
-
kW-mo/yr
$15,576 $112,675
TOTAL IMPLEMENTED $150,435 $78,790 $36,232
330,896
kWh
$2,883
-
kW-mo/yr
- $111,320
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs