| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0246 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,267 | $1,081 | |
| WM0246 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $12,702 | - | |
| WM0245 #04 Y:2025 | 04 | 2025 | Install compressor air intakes in coolest locations | $3,572 | $2,170 | |
| WM0245 #03 Y:2025 | 03 | 2025 | Replace hydraulic / pneumatic equipment with electric equipment | $13,265 | $4,125 | |
| WM0245 #02 Y:2025 | 02 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $65,152 | - | |
| WM0245 #01 Y:2025 | 01 | 2025 | Use or replace with energy efficient substitutes | $92,428 | $550,000 | |
| WM0242 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $658 | $1,200 | |
| WM0242 #04 Y:2025 | 04 | 2025 | Turn off equipment when not in use | $3,099 | $3,099 | |
| WM0242 #03 Y:2025 | 03 | 2025 | Combine utility meters | $6,989 | $2,000 | |
| WM0242 #02 Y:2025 | 02 | 2025 | Reduce space conditioning during non-working hours | $9,282 | - | |
| WM0242 #01 Y:2025 | 01 | 2025 | Install timers on light switches in little used areas | $9,935 | - | |
| WM0241 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $96 | $368 | |
| WM0241 #04 Y:2025 | 04 | 2025 | Re-use or recycle hot or cold process exhaust air | $552 | $635 | |
| WM0241 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,471 | $2,249 | |
| WM0241 #02 Y:2025 | 02 | 2025 | Close holes and openings in building such as broken windows | $1,959 | $6,000 | |
| WM0241 #01 Y:2025 | 01 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $25,950 | - | |
| WM0239 #05 Y:2024 | 05 | 2024 | Install replacement doors | $2,866 | $4,605 | |
| WM0239 #02 Y:2024 | 02 | 2024 | Use waste heat from hot flue gases to preheat | $30,028 | $22,500 | |
| WM0239 #01 Y:2024 | 01 | 2024 | Use synthetic lubricant | $40,192 | $23,257 | |
| WM0238 #04 Y:2024 | 04 | 2024 | Reduce space conditioning during non-working hours | $624 | - |