ITAC Assessment: WM0231
ITAC logo
ITAC Assessment: WM0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product cheese making research and development
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range less than $500
k
# of Employees 102
Plant Area 110,050
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,779 1,492,069
kWh
Electricity Demand $70,706 3,861
kW-mo/yr
Electricity Fees $24,357 -
Natural Gas $66,849 10,859
MMBtu
Waste Disposal Costs
Water Usage $13,639 2,654
Tgal
Water Disposal $13,639 2,654
Tgal
TOTAL YEARLY COSTS $290,968
RECOMMENDED SAVINGS* $17,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2113: Repair or replace steam traps $5,826 $3,840 - - $5,826
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $3,829 $10,000 - - $3,829
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $3,383 $1,500 - - $3,383
-
MMBtu
04 2.7224: Reduce space conditioning during non-working hours $2,105 - - - $2,105
-
MMBtu
05 2.1224: Replace boiler $1,068 $1,150 - - $1,068
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $952 $900 $421
4,834
kWh
$531
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,163 $17,390 $421
4,834
kWh
$531
-
kW-mo/yr
$16,211
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs