ITAC Assessment: WM0228
ITAC logo
ITAC Assessment: WM0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 173,000
ft2
Annual Production 46,663,093
lb
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $833,696 15,558,200
kWh
Electricity Demand $501,117 35,743
kW-mo/yr
Electricity Fees $279,396 -
Natural Gas $399,243 98,749
MMBtu
TOTAL YEARLY COSTS $2,013,452
RECOMMENDED SAVINGS* $24,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $13,416 - $245
4,538
kWh
- $13,171
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $5,628 $3,197 $4,152
76,893
kWh
$1,476
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,531 $4,430 $3,557
65,875
kWh
$974
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,292 $1,200 $953
17,645
kWh
$339
-
kW-mo/yr
-
TOTAL RECOMMENDED $24,868 $8,827 $8,907
164,951
kWh
$2,790
-
kW-mo/yr
$13,171
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs