ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OR0789 #05 Y:2024 | 05 | 2024 | Install common header on compressors | $16,245 | $4,904 | |
OR0789 #03 Y:2024 | 03 | 2024 | Replace fossil fuel equipment with electrical equipment | $4,115 | $1,800 | |
OR0789 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $1,616 | $14,338 | |
OR0788 #06 Y:2024 | 06 | 2024 | Install / repair insulation on steam lines | $2,489 | $150,000 | |
OR0788 #05 Y:2024 | 05 | 2024 | Insulate glazing, walls, ceilings, and roofs | $3,766 | $200,000 | |
OR0788 #04 Y:2024 | 04 | 2024 | Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $6,183 | $30,000 | |
OR0788 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $7,448 | $150,000 | |
OR0788 #02 Y:2024 | 02 | 2024 | Replace hydraulic / pneumatic equipment with electric equipment | $25,469 | $250,000 | |
OR0785 #04 Y:2023 | 04 | 2023 | Size electric motors for peak operating efficiency | $2,475 | $16,140 | |
OR0785 #03 Y:2023 | 03 | 2023 | Optimize plant power factor | $3,141 | $4,510 | |
OR0785 #02 Y:2023 | 02 | 2023 | Install timers and/or thermostats | $4,224 | $1,583 | |
OR0785 #01 Y:2023 | 01 | 2023 | Add equipment/ operators to reduce production bottleneck | $1,209,151 | $28,500 | |
OR0784 #02 Y:2023 | 02 | 2023 | Modify process to reduce material use/cost | $343,134 | $700,000 | |
OR0784 #01 Y:2023 | 01 | 2023 | Use other waste concentration methods | $61,484 | $125,000 | |
OR0783 #03 Y:2023 | 03 | 2023 | Use solar heat to make electricty | $3,100 | $12,972 | |
OR0783 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $668 | $2,977 | |
OR0783 #01 Y:2023 | 01 | 2023 | Size electric motors for peak operating efficiency | $42,275 | $536,339 | |
OR0782 #02 Y:2023 | 02 | 2023 | Replace fossil fuel equipment with electrical equipment | $34,701 | $316,866 | |
OR0781 #04 Y:2023 | 04 | 2023 | Use or replace with energy efficient substitutes | $486,797 | $4,030,000 | |
OR0781 #02 Y:2023 | 02 | 2023 | Optimize plant power factor | $3,665 | $20,839 |