Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,797

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0801 #06 Y:2024 Use solar heat to make electricty $6,884 $92,435
OR0801 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $2,400 $6,763
OR0801 #02 Y:2024 Provide proper maintenance of motor driven equipment $42,000 $50,000
OR0801 #01 Y:2024 Modify process to reduce material use/cost $1,848 -
OR0798 #05 Y:2024 Use solar heat to make electricty $13,899 $90,000
OR0798 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $1,382 $4,736
OR0798 #01 Y:2024 Recycle air for heating, ventilation and air conditioning $1,715 $502
OR0797 #06 Y:2024 Use solar heat to make electricty $43,815 $607,740
OR0797 #04 Y:2024 Change procedures / equipment / operating conditions $3,405 $16,073
OR0797 #02 Y:2024 Re-use or recycle hot or cold process exhaust air $2,639 $227
OR0794 #04 Y:2024 Use solar heat to make electricty $12,662 $67,250
OR0794 #03 Y:2024 Replace fossil fuel equipment with electrical equipment $20,545 $92,473
OR0794 #02 Y:2024 Eliminate or reduce compressed air usage $2,287 $5,523
OR0794 #01 Y:2024 Utilize controls to operate equipment only when needed $1,236 $1,629
OR0793 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $1,117 -
OR0793 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,695 $522
OR0793 #01 Y:2024 Adopt in-house material generation $13,689 $209,197
OR0791 #03 Y:2024 Optimize plant power factor $2,606 $17,324
OR0791 #02 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,032 -
OR0790 #03 Y:2024 Eliminate or reduce compressed air usage $120 $116