Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,766

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0789 #05 Y:2024 Install common header on compressors $16,245 $4,904
OR0789 #03 Y:2024 Replace fossil fuel equipment with electrical equipment $4,115 $1,800
OR0789 #02 Y:2024 Optimize plant power factor $1,616 $14,338
OR0788 #06 Y:2024 Install / repair insulation on steam lines $2,489 $150,000
OR0788 #05 Y:2024 Insulate glazing, walls, ceilings, and roofs $3,766 $200,000
OR0788 #04 Y:2024 Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $6,183 $30,000
OR0788 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,448 $150,000
OR0788 #02 Y:2024 Replace hydraulic / pneumatic equipment with electric equipment $25,469 $250,000
OR0785 #04 Y:2023 Size electric motors for peak operating efficiency $2,475 $16,140
OR0785 #03 Y:2023 Optimize plant power factor $3,141 $4,510
OR0785 #02 Y:2023 Install timers and/or thermostats $4,224 $1,583
OR0785 #01 Y:2023 Add equipment/ operators to reduce production bottleneck $1,209,151 $28,500
OR0784 #02 Y:2023 Modify process to reduce material use/cost $343,134 $700,000
OR0784 #01 Y:2023 Use other waste concentration methods $61,484 $125,000
OR0783 #03 Y:2023 Use solar heat to make electricty $3,100 $12,972
OR0783 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $668 $2,977
OR0783 #01 Y:2023 Size electric motors for peak operating efficiency $42,275 $536,339
OR0782 #02 Y:2023 Replace fossil fuel equipment with electrical equipment $34,701 $316,866
OR0781 #04 Y:2023 Use or replace with energy efficient substitutes $486,797 $4,030,000
OR0781 #02 Y:2023 Optimize plant power factor $3,665 $20,839