Assessment Year | 2024 |
---|---|
Principal Product | Meat |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2011: Meat Packing Plants |
Sales Range | $100 M to 500M |
# of Employees | 552 |
Plant Area |
453,000
ft2
|
Annual Production | 30,000,000
lb
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,290,325 | 22,140,366 |
kWh
|
$0.10 |
Electricity Demand | $152,610 | 53,416 |
kW-mo/yr
|
$2.86 |
Electricity Fees | $200,333 | - |
|
- |
Natural Gas | $1,428,158 | 196,998 |
MMBtu
|
$7.25 |
TOTAL YEARLY COSTS | $4,071,426 | |||
RECOMMENDED SAVINGS* | $466,054 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $1,993 | - |
$1,993
19,261
kWh
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,081 | $1,119 |
$14,062
135,930
kWh
|
$1,019
-
kW-mo/yr
|
- | - | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $37,200 | $18,409 |
$37,200
359,593
kWh
|
- | - | - | - | |
04 | 2.2136: Install / repair insulation on steam lines | $6,357 | $3,090 | - | - |
$6,357
-
MMBtu
|
- | - | |
05 | 3.4111: Use closed cycle process to minimize waste water production | $7,380 | $6,624 | - | - |
$1,984
-
MMBtu
|
- | $5,396 | |
06 | 2.7135: Install occupancy sensors | $2,667 | $3,106 |
$2,667
25,777
kWh
|
- | - | - | - | |
07 | 4.231: Purchase equipment instead of leasing | $395,376 | $1,242,029 | - | - | - | $395,376 | - | |
TOTAL RECOMMENDED | $466,054 | $1,274,377 |
$55,922
540,561
kWh
|
$1,019
-
kW-mo/yr
|
$8,341
-
MMBtu
|
$395,376 | $5,396 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs