ITAC Assessment: GT0648
ITAC logo
ITAC Assessment: GT0648
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Industrial Belts
NAICS
n/a
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area 10,500
ft2
Annual Production 60,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,535 201,348
kWh
Natural Gas $4,242 662
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,034 $4,875 $1,034
11,430
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $153 $168 $153
1,758
kWh
- -
03 2.7135: Install occupancy sensors $97 $52 $97
1,172
kWh
- -
04 4.111: Add equipment/ operators to reduce production bottleneck $7,500 - - - $7,500
05 4.111: Add equipment/ operators to reduce production bottleneck $2,000 $1,000 - - $2,000
06 3.5218: Reuse / recycle/ sell rubber products $45 - - $45
-
lb
-
TOTAL RECOMMENDED $10,829 $6,095 $1,284
14,360
kWh
$45
-
lb
$9,500
TOTAL IMPLEMENTED $9,500 $1,000 - - $9,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs