ITAC Assessment: OR0799
ITAC logo
ITAC Assessment: OR0799
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 242
Plant Area 267,546
ft2
Annual Production 182,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $894,706 20,042,400
kWh
Electricity Demand $212,580 32,639
kW-mo/yr
Electricity Fees $13,213 -
Natural Gas $141,624 14,738
MMBtu
Other Energy $1,882,993 200,971
MMBtu
TOTAL YEARLY COSTS $3,145,116
RECOMMENDED SAVINGS* $161,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $2,039 - $2,039
45,687
kWh
- - -
02 2.2437: Recover waste heat from equipment $10,927 $3,514 - - $10,927
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $32,971 $41,770 - - - $32,971
-
MMBtu
04 2.9114: Use solar heat to make electricty $112,659 $399,900 $81,419
1,823,594
kWh
$31,240
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,006 $11,189 $2,467
55,259
kWh
$539
-
kW-mo/yr
- -
TOTAL RECOMMENDED $161,602 $456,373 $85,925
1,924,540
kWh
$31,779
-
kW-mo/yr
$10,927
-
MMBtu
$32,971
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs