Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated shipping containers
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2510:
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 160,000
ft2
Annual Production 420,000,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,674 2,637,000
kWh
Electricity Demand $112,858 7,539
kW-mo/yr
Electricity Fees $1,661 -
Natural Gas $153,054 36,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $827

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $7,229 $6,100 - - - $7,229
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,655 $2,035 $1,518
21,696
kWh
$1,137
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $1,138 $5,410 - - $1,138 -
04 2.7135: Install occupancy sensors $1,003 $1,065 $1,003
70,512
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $720 $133 $720
10,285
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $376 - $376
5,370
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $250 $1,031 $250
3,571
kWh
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $107 - $102
1,456
kWh
$5
-
kW-mo/yr
- -
TOTAL RECOMMENDED $13,478 $15,774 $3,969
112,890
kWh
$1,142
-
kW-mo/yr
$1,138 $7,229
-
MMBtu
TOTAL IMPLEMENTED $827 $133 $822
11,741
kWh
$5
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs