Assessment Year | 2017 |
---|---|
Principal Product | vitamin supplements |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
130,000
ft2
|
Annual Production | 900,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $436,470 | 7,024,000 |
kWh
|
$0.062 |
Electricity Demand | $45,676 | 11,462 |
kW-mo/yr
|
$3.98 |
Electricity Fees | $17,358 | - |
|
- |
Natural Gas | $122,327 | 22,227 |
MMBtu
|
$5.50 |
TOTAL YEARLY COSTS | $621,831 | |||
RECOMMENDED SAVINGS* | $145,244 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $126,102 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $4,142 | $30 |
$4,142
66,800
kWh
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $2,033 | $30 |
$548
8,832
kWh
|
- |
$1,485
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $672 | $30 |
$616
9,932
kWh
|
$56
-
kW-mo/yr
|
- | |
04 | 2.7311: Ventilation system to shut off when room is not in use | $9,554 | $500 |
$7,659
123,532
kWh
|
$1,895
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,447 | $1,000 |
$5,004
80,709
kWh
|
$443
-
kW-mo/yr
|
- | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $22,087 | $5,000 |
$18,768
302,706
kWh
|
$3,320
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $89,899 | $25,000 |
$83,961
1,354,216
kWh
|
$5,937
-
kW-mo/yr
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $940 | $1,500 |
$693
11,178
kWh
|
$247
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,120 | $29,145 |
$8,354
134,736
kWh
|
$766
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,351 | $6,525 |
$1,064
17,160
kWh
|
$287
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $145,244 | $68,760 |
$130,808
2,109,801
kWh
|
$12,952
-
kW-mo/yr
|
$1,485
-
MMBtu
|
||
TOTAL IMPLEMENTED | $126,102 | $67,230 |
$114,003
1,838,760
kWh
|
$10,613
-
kW-mo/yr
|
$1,485
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs