Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

485

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0272 #11 Y:2025 Optimize plant power factor $1,250 $11,200
UU0272 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,170 $26,600
UU0272 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,950 $23,600
AS0584 #07 Y:2024 Install occupancy sensors $1,782 $666
AS0584 #06 Y:2024 Install timers on light switches in little used areas $3,113 $759
AS0584 #04 Y:2024 Change rate schedules or other changes in utility service $5,396 $154
AS0584 #02 Y:2024 Use solar heat to make electricty $21,817 $160,594
AS0583 #07 Y:2024 Install spectral reflectors / delamp $94 $52
AS0583 #06 Y:2024 Install occupancy sensors $122 $476
AS0583 #05 Y:2024 Install timers on light switches in little used areas $137 $172
AS0583 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $2,282 $4,696
AS0583 #03 Y:2024 Eliminate old stock and modify inventory control $4,022 $1,805
AS0583 #02 Y:2024 Add air shields to trucks to increase fuel mileage $43,888 $15,124
AS0583 #01 Y:2024 Use solar heat to make electricty $87,396 $642,159
UU0193 #06 Y:2021 Install occupancy sensors $946 $3,500
SF0576 #07 Y:2021 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $168,685 $1,228,444
SF0576 #01 Y:2021 Replace high resistance ducts, pipes, and fittings $15,824 -
SF0575 #03 Y:2021 Turn off equipment when not in use $6,526 -
SF0575 #02 Y:2021 Chill water to the highest temperature possible $5,510 -
SF0575 #01 Y:2021 Reduce the pressure of compressed air to the minimum required $1,492 $100