475

matching recommendations
$
$
ID Description Yearly
Savings
Imp
Cost
AS0584 #07 Y:2024 Install occupancy sensors $1,782 $666
AS0584 #06 Y:2024 Install timers on light switches in little used areas $3,113 $759
AS0584 #04 Y:2024 Change rate schedules or other changes in utility service $5,396 $154
AS0584 #02 Y:2024 Use solar heat to make electricty $21,817 $160,594
UU0193 #06 Y:2021 Install occupancy sensors $946 $3,500
SF0576 #07 Y:2021 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $168,685 $1,228,444
SF0576 #01 Y:2021 Replace high resistance ducts, pipes, and fittings $15,824 -
SF0575 #03 Y:2021 Turn off equipment when not in use $6,526 -
SF0575 #02 Y:2021 Chill water to the highest temperature possible $5,510 -
SF0575 #01 Y:2021 Reduce the pressure of compressed air to the minimum required $1,492 $100
AS0483 #05 Y:2019 Use or replace with energy efficient substitutes $196 $226
AS0483 #04 Y:2019 Reduce / eliminate use of disposable product $2,057 $1,070
AS0483 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $3,493 $4,974
AS0483 #02 Y:2019 Combine utility meters $19,902 $520
AS0483 #01 Y:2019 Change rate schedules or other changes in utility service $26,222 $200
AS0482 #02 Y:2019 Combine utility meters $5,394 $416
UU0145 #05 Y:2018 Install compressor air intakes in coolest locations $25,041 $5,000
UU0145 #04 Y:2018 Upgrade controls on compressors $47,010 $23,850
UU0145 #02 Y:2018 Reschedule plant operations or reduce load to avoid peaks $373,488 $10,000
UU0145 #01 Y:2018 Add equipment/ operators to reduce production bottleneck $377,567 $872,000