ITAC Assessment: AS0583
ITAC logo
ITAC Assessment: AS0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plumbing Fixtures
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3088: Plastics Plumbing Fixtures
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 151,338
ft2
Annual Production 110,000
units
Production Hrs. Annual 2,270
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,608 1,944,360
kWh
Electricity Demand $80,271 8,909
kW-mo/yr
Electricity Fees $1,824 -
LPG $436,674 20,782
MMBtu
Fuel Oil #1 $877,473 31,050
MMBtu
Waste Disposal Costs
Water Usage $8,073 907
Tgal
TOTAL YEARLY COSTS $1,533,923
RECOMMENDED SAVINGS* $137,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.9114: Use solar heat to make electricty $87,396 $642,159 $60,083
900,795
kWh
$27,313
-
kW-mo/yr
- - -
02 2.8223: Add air shields to trucks to increase fuel mileage $43,888 $15,124 - - $43,888
-
MMBtu
- -
03 4.322: Eliminate old stock and modify inventory control $4,022 $1,805 - - - - $4,022
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,282 $4,696 $1,331
19,964
kWh
$951
-
kW-mo/yr
- - -
05 2.7132: Install timers on light switches in little used areas $137 $172 $137
2,051
kWh
- - - -
06 2.7135: Install occupancy sensors $122 $476 $71
1,059
kWh
$51
-
kW-mo/yr
- - -
07 2.7144: Install spectral reflectors / delamp $94 $52 $30
445
kWh
$22
-
kW-mo/yr
- $42 -
TOTAL RECOMMENDED $137,941 $664,484 $61,652
924,314
kWh
$28,337
-
kW-mo/yr
$43,888
-
MMBtu
$42 $4,022
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs