Assessment Year | 2019 |
---|---|
Principal Product | Corrugated sheets |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
162,400
ft2
|
Annual Production | 2,100
thousand feet
|
Production Hrs. Annual | 7,320
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $198,944 | 4,876,544 |
kWh
|
$0.041 |
Electricity Demand | $109,609 | 12,804 |
kW-mo/yr
|
$8.56 |
Electricity Fees | $7,125 | - |
|
- |
Natural Gas | $265,348 | 93,333 |
MMBtu
|
$2.84 |
TOTAL YEARLY COSTS | $581,026 | |||
RECOMMENDED SAVINGS* | $78,205 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $54,420 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $35,280 | $50 | - | - | - | $17,640 | $17,640 | |
02 | 2.3212: Optimize plant power factor | $22,000 | $27,030 | - |
$22,000
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,580 | $2,000 |
$12,050
294,000
kWh
|
$4,530
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,540 | $11 |
$1,120
27,370
kWh
|
$420
-
kW-mo/yr
|
- | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $405 | $1,320 | - | - |
$405
-
MMBtu
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $475 | - |
$345
8,355
kWh
|
$130
-
kW-mo/yr
|
- | - | - | |
07 | 2.4314: Use synthetic lubricant | $1,310 | $225 |
$940
22,830
kWh
|
$370
-
kW-mo/yr
|
- | - | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $615 | - |
$615
14,980
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $78,205 | $30,636 |
$15,070
367,535
kWh
|
$27,450
-
kW-mo/yr
|
$405
-
MMBtu
|
$17,640 | $17,640 | ||
TOTAL IMPLEMENTED | $54,420 | $3,381 |
$13,785
336,350
kWh
|
$4,950
-
kW-mo/yr
|
$405
-
MMBtu
|
$17,640 | $17,640 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs