ITAC Assessment: AM0775
ITAC logo
ITAC Assessment: AM0775
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Corrugated sheets
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 162,400
ft2
Annual Production 2,100
thousand feet
Production Hrs. Annual 7,320
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,944 4,876,544
kWh
Electricity Demand $109,609 12,804
kW-mo/yr
Electricity Fees $7,125 -
Natural Gas $265,348 93,333
MMBtu
TOTAL YEARLY COSTS $581,026
RECOMMENDED SAVINGS* $78,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,420

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $35,280 $50 - - - $17,640 $17,640
02 2.3212: Optimize plant power factor $22,000 $27,030 - $22,000
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,580 $2,000 $12,050
294,000
kWh
$4,530
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,540 $11 $1,120
27,370
kWh
$420
-
kW-mo/yr
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $405 $1,320 - - $405
-
MMBtu
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $475 - $345
8,355
kWh
$130
-
kW-mo/yr
- - -
07 2.4314: Use synthetic lubricant $1,310 $225 $940
22,830
kWh
$370
-
kW-mo/yr
- - -
08 2.7124: Make a practice of turning off lights when not needed $615 - $615
14,980
kWh
- - - -
TOTAL RECOMMENDED $78,205 $30,636 $15,070
367,535
kWh
$27,450
-
kW-mo/yr
$405
-
MMBtu
$17,640 $17,640
TOTAL IMPLEMENTED $54,420 $3,381 $13,785
336,350
kWh
$4,950
-
kW-mo/yr
$405
-
MMBtu
$17,640 $17,640
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs