Assessment Year | 1990 |
---|---|
Principal Product | SPECIAL HEADED FASTERNER |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 33,000,000
lb
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $278,397 | 3,813,306 |
kWh
|
$0.073 |
Natural Gas | $78,470 | 17,504 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,419 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,228 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $11,466 | $5,000 | - |
$11,466
-
MMBtu
|
|
02 | 2.7261: Install timers and/or thermostats | $9,520 | $1,250 | - |
$9,520
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $5,028 | $1,500 | - |
$5,028
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $2,686 | $1,500 |
$2,686
36,928
kWh
|
- | |
05 | 2.6232: Install set-back timers | $1,478 | $200 |
$1,478
20,223
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,870 | $6,070 |
$1,870
25,498
kWh
|
- | |
07 | 2.6121: Reduce hot water temperature to the minimum required | $247 | - |
$164
2,345
kWh
|
$83
-
MMBtu
|
|
08 | 2.3132: Recharge batteries on during off-peak demand periods | $124 | - |
$124
-
kWh
|
- | |
TOTAL RECOMMENDED | $32,419 | $15,520 |
$6,322
84,994
kWh
|
$26,097
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,228 | $10,320 |
$4,680
62,426
kWh
|
$14,548
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs