ITAC Assessment: WI0081
ITAC logo
ITAC Assessment: WI0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SPECIAL HEADED FASTERNER
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 33,000,000
lb
Production Hrs. Annual 5,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $278,397 3,813,306
kWh
Natural Gas $78,470 17,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $11,466 $5,000 - $11,466
-
MMBtu
02 2.7261: Install timers and/or thermostats $9,520 $1,250 - $9,520
-
MMBtu
03 2.2437: Recover waste heat from equipment $5,028 $1,500 - $5,028
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $2,686 $1,500 $2,686
36,928
kWh
-
05 2.6232: Install set-back timers $1,478 $200 $1,478
20,223
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,870 $6,070 $1,870
25,498
kWh
-
07 2.6121: Reduce hot water temperature to the minimum required $247 - $164
2,345
kWh
$83
-
MMBtu
08 2.3132: Recharge batteries on during off-peak demand periods $124 - $124
-
kWh
-
TOTAL RECOMMENDED $32,419 $15,520 $6,322
84,994
kWh
$26,097
-
MMBtu
TOTAL IMPLEMENTED $19,228 $10,320 $4,680
62,426
kWh
$14,548
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs