ITAC Assessment: OD0032
ITAC logo
ITAC Assessment: OD0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Special Regulators and Torches
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 135,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 2,338
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,950 2,876,319
kWh
Natural Gas $16,681 2,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,993

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $5,570 $75 $5,570
52,755
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,583 $800 $1,583
25,791
kWh
-
03 2.7135: Install occupancy sensors $1,789 $1,374 $1,789
29,015
kWh
-
04 2.2437: Recover waste heat from equipment $1,788 $1,447 - $1,788
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $410 $396 $410
6,741
kWh
-
06 2.6232: Install set-back timers $1,343 $1,075 - $1,343
-
MMBtu
TOTAL RECOMMENDED $12,483 $5,167 $9,352
114,302
kWh
$3,131
-
MMBtu
TOTAL IMPLEMENTED $1,993 $1,196 $1,993
32,532
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs