ITAC Assessment: BD0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Bakery goods
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 214,000
ft2
Annual Production 6,900,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,147,899 22,970,679
kWh
Electricity Demand $139,047 48,293
kW-mo/yr
Electricity Fees $58,777 -
Natural Gas $573,044 109,426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $142,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $72,574 $19,000 $67,112
1,384,705
kWh
$5,462
-
kW-mo/yr
-
02 2.1221: Replace obsolete burners with more efficient ones $26,133 $39,000 - - $26,133
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $18,092 $30,000 - - $18,092
-
MMBtu
04 2.4133: Use most efficient type of electric motors $10,736 $20,080 $9,665
19,301
kWh
$1,071
-
kW-mo/yr
-
05 2.2531: Re-size charging openings or add movable cover or door $6,576 $300 - - $6,576
-
MMBtu
06 2.7135: Install occupancy sensors $3,890 $4,200 $3,585
71,997
kWh
$305
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $4,851 $600 $4,475
91,515
kWh
$376
-
kW-mo/yr
-
TOTAL RECOMMENDED $142,852 $113,180 $84,837
1,567,518
kWh
$7,214
-
kW-mo/yr
$50,801
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs