Assessment Year | 2011 |
---|---|
Principal Product | Bakery goods |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
214,000
ft2
|
Annual Production | 6,900,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,147,899 | 22,970,679 |
kWh
|
$0.050 |
Electricity Demand | $139,047 | 48,293 |
kW-mo/yr
|
$2.88 |
Electricity Fees | $58,777 | - |
|
- |
Natural Gas | $573,044 | 109,426 |
MMBtu
|
$5.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $142,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $72,574 | $19,000 |
$67,112
1,384,705
kWh
|
$5,462
-
kW-mo/yr
|
- | |
02 | 2.1221: Replace obsolete burners with more efficient ones | $26,133 | $39,000 | - | - |
$26,133
-
MMBtu
|
|
03 | 2.2414: Use waste heat from hot flue gases to preheat | $18,092 | $30,000 | - | - |
$18,092
-
MMBtu
|
|
04 | 2.4133: Use most efficient type of electric motors | $10,736 | $20,080 |
$9,665
19,301
kWh
|
$1,071
-
kW-mo/yr
|
- | |
05 | 2.2531: Re-size charging openings or add movable cover or door | $6,576 | $300 | - | - |
$6,576
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $3,890 | $4,200 |
$3,585
71,997
kWh
|
$305
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $4,851 | $600 |
$4,475
91,515
kWh
|
$376
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $142,852 | $113,180 |
$84,837
1,567,518
kWh
|
$7,214
-
kW-mo/yr
|
$50,801
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs