ITAC Assessment: UD0533
ITAC logo
ITAC Assessment: UD0533
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Lubricants Oils, Calcium Oxide
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 42
Plant Area 40,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,302 438,746
kWh
Electricity Demand $15,774 2,868
kW-mo/yr
Natural Gas $12,801 2,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,437

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $508 - $508
11,430
kWh
- - - - -
02 2.3191: Use demand controller or load shedder $2,468 $200 - $2,468
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,455 $2,564 $1,188
26,964
kWh
$267
-
kW-mo/yr
- - - -
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $352 $50 $201
4,689
kWh
$151
-
kW-mo/yr
- - - -
05 2.4224: Upgrade controls on compressors $553 $750 $264
5,862
kWh
- $289
-
MMBtu
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,574 $20,000 $2,636
59,789
kWh
$469
-
kW-mo/yr
$(-1,531.0)
-
MMBtu
- - -
07 4.652: Replace existing equipment with more suitable substitutes $37,000 $36,000 - - - - $35,000 $2,000
08 2.6212: Turn off equipment during breaks, reduce operating time $101 $50 $58
1,172
kWh
$43
-
kW-mo/yr
- - - -
09 3.4151: Minimize water usage $125 $60 - - $35
-
MMBtu
$90
-
lb
- -
TOTAL RECOMMENDED $44,136 $59,674 $4,855
109,906
kWh
$3,398
-
kW-mo/yr
$(-1,207.0)
-
MMBtu
$90
-
lb
$35,000 $2,000
TOTAL IMPLEMENTED $42,437 $39,614 $2,219
50,117
kWh
$2,929
-
kW-mo/yr
$289
-
MMBtu
- $35,000 $2,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs