ITAC Assessment: OK0210
ITAC logo
ITAC Assessment: OK0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product BREAD AND BUNS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 360
Plant Area
n/a
Annual Production 50,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,781 3,337,046
kWh
Natural Gas $119,977 32,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $766 $354 $766
16,999
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $466 $704 $466
10,258
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $325 - $365
11,723
kWh
- $(-40.0)
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,923 $1,500 - $2,923
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $4,581 - - $4,581
-
MMBtu
-
TOTAL RECOMMENDED $9,061 $2,558 $1,597
38,980
kWh
$7,504
-
MMBtu
$(-40.0)
TOTAL IMPLEMENTED $4,480 $2,558 $1,597
38,980
kWh
$2,923
-
MMBtu
$(-40.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs