Assessment Year | 2021 |
---|---|
Principal Product | Reclaim Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 10 |
Plant Area |
660,000
ft2
|
Annual Production | 1,825,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nevada |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $177,192 | 4,859,948 |
kWh
|
$0.036 |
Electricity Demand | $91,836 | 10,308 |
kW-mo/yr
|
$8.91 |
Electricity Fees | $20,675 | - |
|
- |
Natural Gas | $9,905 | 1,087 |
MMBtu
|
$9.11 |
TOTAL YEARLY COSTS | $299,608 | |||
RECOMMENDED SAVINGS* | $259,702 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $75,193 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.5122: Replace high resistance ducts, pipes, and fittings | $15,824 | - |
$13,413
201,181
kWh
|
$2,411
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,886 | $120 |
$2,444
36,662
kWh
|
$442
-
kW-mo/yr
|
- | - | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $12,092 | $14,612 |
$10,248
153,644
kWh
|
$1,844
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,261 | $17,288 |
$10,392
155,083
kWh
|
$1,869
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,882 | $28,653 |
$3,831
57,458
kWh
|
$1,654
-
kW-mo/yr
|
- | $653 | $744 | |
06 | 2.4322: Use or replace with energy efficient substitutes | $41,072 | $554,541 |
$9,693
145,381
kWh
|
$16,212
-
kW-mo/yr
|
- | $15,167 | - | |
07 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $168,685 | $1,228,444 |
$213,419
3,201,120
kWh
|
$38,500
-
kW-mo/yr
|
$(-38,418.0)
-
MMBtu
|
$(-44,816.0) | - | |
TOTAL RECOMMENDED | $259,702 | $1,843,658 |
$263,440
3,950,529
kWh
|
$62,932
-
kW-mo/yr
|
$(-38,418.0)
-
MMBtu
|
$(-28,996.0) | $744 | ||
TOTAL IMPLEMENTED | $75,193 | $615,214 |
$36,608
548,228
kWh
|
$22,021
-
kW-mo/yr
|
- | $15,820 | $744 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs