ITAC Assessment: UD0544
ITAC logo
ITAC Assessment: UD0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wooden Doors and windows
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 81,000
ft2
Annual Production 97,000
pieces
Production Hrs. Annual 5,125
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,217 1,085,287
kWh
Electricity Demand $53,860 3,828
kW-mo/yr
Natural Gas $16,557 3,424
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.1121: Use more efficient adhesive applicators $15,189 $500 - - - - $15,189
02 4.611: Begin a practice of predictive / preventative maintenance $13,720 $800 - - $13,720 - -
03 2.6218: Turn off equipment when not in use $8,392 - $1,976
75,909
kWh
$6,416
-
kW-mo/yr
- - -
04 2.7111: Reduce illumination to minimum necessary levels $6,427 $1,000 $1,582
60,961
kWh
$4,581
-
kW-mo/yr
- - $264
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,145 $1,000 $1,152
44,256
kWh
$2,993
-
kW-mo/yr
- - -
06 2.1132: Repair faulty louvers and dampers $2,092 $400 $910
34,877
kWh
$1,182
-
kW-mo/yr
- - -
07 2.4313: Provide proper maintenance of motor driven equipment $2,054 - $1,579
60,668
kWh
- - $475 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,695 $3,472 $748
28,722
kWh
$947
-
kW-mo/yr
- - -
09 2.7111: Reduce illumination to minimum necessary levels $922 $700 $922
35,463
kWh
- - - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $769 - $181
7,034
kWh
$588
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $55,405 $7,872 $9,050
347,890
kWh
$16,707
-
kW-mo/yr
$13,720 $475 $15,453
TOTAL IMPLEMENTED $39,990 $3,600 $8,302
319,168
kWh
$15,760
-
kW-mo/yr
- $475 $15,453
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs